PERFORMANCE ANALYSIS EGS-CC BASED APPLICATIONS- EXPRO PLUS
20, July 2018

ESA Open Invitation to Tender AO9451
Open Date: 17/07/2018
Closing Date: 28/08/2018 13:00:00

Status: ISSUED
Reference Nr.: 18.132.05
Prog. Ref.: GSTP Element 1 Dev
Budget Ref.: E/0904-611 – GSTP Element 1 Dev
Special Prov.: AT
Tender Type: C
Price Range: 100-200 KEURO
Products: Ground Segment / Mission Operations / Other
Techology Domains: Others
Establishment: ESTEC
Directorate: Directorate of Tech, Eng. & Quality
Department: System, Software & Technology Department
Division: Software Systems Division
Contract Officer: Singer, Anze
Industrial Policy Measure: N/A – Not apply
Last Update Date: 17/07/2018
Update Reason: Tender issue

The EGS-CC (European Ground System Common Core) project aims at developing the common core functions of the next generation European Electrical Ground Support Equipment (EGSE) and Mission Control Systems (MCS). The facilities build from the EGS-CC will support the functional verification (FV) of satellites at early development stages, the satellite level assembly integration and verification (AIV) process and the Mission Control pre- and post-launch. The EGS-CC project is currently in phase C/D.Performance of a system isits responsiveness/scalability and stability/reliability under particular workload. Ensuring optimal performance from a complex system like the EGS-CC is a difficult task as critical functions like telemetry archiving, telecommanding and telemetry processing are carried out in parallel through collaboration of multiple components and it is difficult to apportion performance to individual components. For EGS-CC to be a successful product, its performance must meet existing requirements and allow improvement of that performance in future evolution.This activity aims at ensuring that the expected performance of the integrated EGSCC product, e.g. the EGS-CC components themselves or applications built on top of it, is achieved in an optimal manner and even exceeded.In the frame of this activity the following tasks are foreseen: – Implement the necessary tools and facilties to measure performance and the system and component levels – Measure performance and associated quality attributes of the EGS-CC based on existing Reference Test Facility and defined test scenarios – Analyse and evaluate EGS-CC performance requirements based on measurements – Write evaluation report with possible recommendations

If you wish to access the documents related to the Invitation to Tender, you have to log in to the ESA Portal.