ESA Open Invitation to Tender AO9989
Open Date: 04/10/2019
Closing Date: 15/11/2019 13:00:00
Status: ISSUED
Reference Nr.: 19.164.05
Prog. Ref.: MP- Studies
Budget Ref.: E/0401-01 – MP- Studies
Special Prov.: AT+BE+CH+CZ+DE+DK+EE+ES+FI+FR+GB+GR+HU+IE+IT+LU+NL+NO+PL+PT+RO+SE
Tender Type: C
Price Range: > 500 KEURO
Products: Satellites & Probes / Payloads / Instruments / Optical Instruments / Imaging spectrometers / Satellites & Probes / Payloads / Instruments / InfraRed instruments / Telescopes, ¿ / Satellites & Probes / Structures / Structures – BB / Central tubes, Bars and rods, ¿ / Satellites & Probes / Thermal Control / Heat Transport / Low temperature CPL/LHP (Capillary Pumped Loop/Loop Heat Pipe) / Satellites & Probes / Thermal Control / Thermal control – BB / Cold plates
Technology Domains: System Design & Verification / Mission and System Specification / Requirement Engineering / Structures / High Stability and High-Precision S/C Structures / Thermo-elastic Stability Verification Technologies / Thermal / Heat Transport Technology / Heat Pipes / Thermal / Cryogenics and Refrigeration / Cryo-Coolers
Establishment: ESTEC
Directorate: Directorate of Science
Department: Future Missions Office
Contract Officer: Weihert, Beatrice
Industrial Policy Measure: N/A – Not apply
Last Update Date: 04/10/2019
Update Reason: Tender issue
The industrial SIM Phase-A/B parallel industrial contracts will cover the following objectives:- Refinement of the technical design of the SIM, including: design, modelling, justification.- Consolidation of the SIM interfaces the SC.- Overall system engineering of the SIM, including co-engineering with the instruments consortia for converging to a robust overall development approach and consolidation of interfaces.- Definition and optimisation of the SIM implementation scheme, by taking into account potential programmatic constraints from ESA.- Consolidation of SIM requirements and their decomposition in consistency with the preferred implementation scheme.- As needed, RFI campaign to consolidate the implementation scheme approach.- Definition of the Development and Verification Plan of the SIM, including definition of the subsystem layer, model philosophy and verification approach by taking into account the instruments, and overall development schedule integrating the instruments schedule needs.- Production of the technical data package concluding the SIM Phase A/B activities (PDR level).- Elaboration of the baseline schedule on the basis of the project planning.- Risk analysis and cost estimate for the baseline SIM. The level of detail of the cost estimate shall enable the contractor toprovide a binding offer for the following Phase C/D- PA and QA planning.- Support of the MAR.
If you wish to access the documents related to the Invitation to Tender, you have to log in to the ESA Portal.