PHASE 0/A SYSTEM STUDIES OF THE WIVERN MISSION
15, December 2021

ESA Open Invitation to Tender: 1-11069
Open Date: 13/12/2021 11:22 CEST
Closing Date: 18/02/2022 13:00 CEST

Wivern – short for wind velocity radar nephoscope – is the only mission in the world that would measure wind in clouds, and deliverprofiles of rain, snow and ice water. Carrying a dual-polarisation, conically scanning 94 GHz Doppler radar, the mission would benefit the prediction of high-impact weather and hazard warnings for weather forecast models and contribute to the climate record of cloud and precipitation profiling. The procurement in subject includes the Phase 0 system studies and Phase A system studies which will be performed through a phased contract. Subject to reception of good quality proposals, it is intended to place two parallel contracts. Phase 0: the Phase 0 system study will cover all elements of the mission architecture: space segment (platforms and instruments), ground segments, operations and exploitation concepts. These studies will be based on the Agency’s Statement of Work (SoW) and the Mission Assumptions and preliminary Technical Requirements (MATER). Risk retirement activities will also be identified and initiated within the frame of the study, to raise TRL of critical technologies. The expected duration of the Phase 0 system studies is 14 months from kick-off to final approval of all deliverables. The results of the Phase 0 will be used as input for the down selection of two EE-11 missions out of four to progress to phase A. If the mission is selected the second phase of the contract will be initiated, otherwise the contract will be terminated. Phase A: The Phase A system study will address all elements of the mission architecture, namely space segment (platform and payload), ground segment, mission operations and exploitation. The Phase A system study will be based on the Statement of Work (SoW) applicable from the beginning of the contract and the System Requirements Document (SRD) established by ESA and consolidated at the end of the phase 0. Relevant technology pre-developments will be initiated within the frame of the study, to raise TRL of critical technologies, with the aim to reach TRL 4 by the end of phase A, and with a final goal to reach TRL 5 by the end of phase B1. The expected duration of the Phase A system studies is 14 months from kick-off to final approval of all deliverables. The results of the Phase A will be used as input for the down selection of one EE-11 mission out of the remaining two to progress to phase B1. It is expected that Phase B1 will be placed as a rider to the Phase 0/A contract of the EE-11 mission selected for implementation.

Estabilishment: ESTEC
ECOS Required: No
Classified: No
Price Range: > 500 KEURO
Authorised Contact Person: Irene Aupetit
Initiating Service: EOP-8M
IP Measure: N/A
Prog. Reference: E/A104-01 – FoundConcept Block 1; E/0600-05 – Preparation Element; E/A104-01 – FoundConcept Block 1
Tender Type: Open Competition
Open To Tenderers From: AT+BE+CA+CH+CZ+DE+DK+EE+EL+ES+FI+FR+GB+HU+IE+IT+LT+LU+LV+NL+NO+PL+PT+RO+SE+SI
Technology Keywords: 8-A-I-Specification Methods and Tools / 8-C-I-Design and Simulation
Products Keywords: 2-P-Other

If you wish to access the documents related to the Invitation to Tender, you have to log in to the ESA Portal.