BIOMASS MISSION PLANNING FACILITY IMPLEMENTATION
5, iunie 2020

ESA Open Invitation to Tender AO10364
Open Date: 29/05/2020
Closing Date: 13/07/2020 13:00:00

Status: ISSUED
Reference Nr.: 20.187.10
Prog. Ref.: EOEP-4 Earth Explo.7
Budget Ref.: E/0087-E4 – EOEP-4 Earth Explo.7
Special Prov.: BE+DK+FR+DE+IT+NL+ES+SE+CH+GB+IE+AT+NO+FI+PT+LU+CZ+RO+PL+EE+CA
Tender Type: C
Products: Ground Segment / Mission Operations / Other
Technology Domains: Space System Software / Earth Observation Payload Data Exploitation / Data and Information Processing and Exploitation
Establishment: ESRIN
Directorate: Directorate of EO Programmes
Department: EO Mission Management & GS Department
Division: ESA Ground Segment & Data Mngmt Division
Contract Officer: Frigot, Emma
Industrial Policy Measure: N/A – Not apply
Last Update Date: 29/05/2020
Update Reason: Tender issue

BIOMASS is ESAs 7th Earth Explorer mission. The mission was selected for implementation in 2012. BIOMASS is implemented as a singleplatform repeat pass interferometric and fully polarimetric P-band SAR mission. The instrument is operated in a simple stripmap mode acquiring global data in a predefined orbit scenario. The main objective of BIOMASS is to provide estimates of the distribution ofthe above ground forest biomass, of forest height and its temporal dynamics and disturbances, mainly for the tropical forest. This information shall greatly reduce the uncertainty of the land component in the global carbon cycle. BIOMASS launch is foreseen in 2022 with a commissioning phase of ~6 months. The phase E2 is composed of two phases. The tomographic phase of ~14 months and the interferometric phase for the remaining 4 years, cumulating 5 years of expected lifetime.This procurement is performed under the frame of the development of the BIOMASS Payload Data Ground Segment. Its scope is to implement the Biomass Mission Planning facility, which is in charge of:Planning the Biomass instrument activitiesPlanning the on-board and on ground X-Band downlink activities The main tasks requested are: Design, Development and testing up to the delivery of the SW, implementing the requested functionalities, together with the required supporting documentationProvision of engineering support for PDGS system level integration, training and PDGS commissioningCorrective and evolutive maintenance The contract expected duration is 43 months.

If you wish to access the documents related to the Invitation to Tender, you have to log in to the ESA Portal.