COPERNICUS SENTINEL-3 OPTICAL NEXT GENERATION PHASE 0 SYSTEM STUDY
11, decembrie 2020

ESA Open Invitation to Tender AO10592
Open Date: 10/12/2020
Closing Date: 04/02/2021 13:00:00

Status: ISSUED
Reference Nr.: 20.18I.06
Prog. Ref.: Preparation Element;FoundConcept Block 1
Budget Ref.: E/0600-05 – Preparation Element;E/A104-01 – FoundConcept Block 1
Special Prov.: AT+BE+CH+CZ+DE+DK+ES+FI+FR+GB+GR+HU+IE+IT+LU+NL+NO+PT+PL+RO+SE+CA+SI+LT
Tender Type: C
Price Range: > 500 KEURO
Products: Satellites & Probes / Other
Technology Domains: System Design & Verification / Mission and System Specification / Requirement Engineering / System Design & Verification / System Analysis and Design / Design and Simulation Others
Establishment: ESTEC
Directorate: Directorate of EO Programmes
Division: Future Missions & Instrument Division
Contract Officer: Doblas, Ana
Industrial Policy Measure: N/A – Not apply
Last Update Date: 10/12/2020
Update Reason: Tender issue

The SOW addresses the tasks to be performed in the frame of the planned Phase 0 System Study for the Next Generation of the Copernicus Sentinel-3 Optical missions. Sentinel-3 Next Generation forms part of the Sentinel Optical Imaging family and will guarantee theenhanced continuity of the Ocean and Land Color Imager (OLCI) delivered data as well as the data currently delivered by the Sea andLand Surface Temperature Radiometer (SLSTR).

If you wish to access the documents related to the Invitation to Tender, you have to log in to the ESA Portal.